Primary dust treatment, water and steam cooled pipes (PED)
COMECA TECNOLOGIE S.p.A. designs, builds and installs complete dust treatment plants.

Design and construction work meet all regulatory and environmental requirements as well as specific customer needs.

Cooled gas duct

122-meter water cooled EAF off-gas duct. Section 2220x3330mm.


ask for information
Cooled gas duct

32-meter primary water cooled EAF off gas duct. Section 1450 x 1960 mm.


ask for information
Settling chamber

Built with water cooled panels, equipped with automatic dust collection and discharge system. Direct suction on EAF with sliding sleeve for flow rate control. Total height 9 mt.


ask for information
Settling chamber for energy recovery system

Made with pipe to pipe panels for the production of steam and complete with dust collection system. Certified according to the directive 97/23/CE (PED) Category IV, Module G.


ask for information
Intake elbow to settling chamber

A pipe to pipe unit with mobile piston-driven sleeve and connection inlet to the dust chamber.


ask for information
FOR MORE INFORMATION