Primary dust treatment, water and steam cooled pipes (PED)
COMECA TECNOLOGIE S.p.A. designs builds and installs complete dust treatment plants

Design and construction work meet all regulatory and environmental requirements as well as specific customer needs.

Cooled gas duct

122-meter water cooled EAF off-gas duct.  Section 2220x3330mm.


Information requested
Cooled gas duct

32-meter primary water cooled EAF off gas duct.

 Section 1450 x 1960 mm.


Information requested
Settling chamber

Built with water cooled panels, equipped with automatic dust collection and discharge system. Direct suction on EAF with sliding sleeve for flow rate control. Total height 9m.


Information requested
Settling chamber for energy recovery system

Made with pipe to pipe panels for the production of steam, and complete with dust collection system. Certified according to the directive 97/23/CE (PED) Category IV, Module G.


Information requested
Intake elbow to settling chamber

A pipe to pipe unit with mobile piston-driven sleeve and connection inlet to the dust chamber.


Information requested
FOR MORE INFORMATION?